Projects
Golden Share Minerals Corporation
Forsan Property

  • 35,000 oz Au Inferred Resource (NI 43-101 compliant) on Forsan Main Zone ("FMZ"): 536,500 MT @ 2.03 g/t Au at 1.00 g/t Au cut off
  • New discovery on the Forsan East Zone ("FEZ") with a drill intersection of 56.86 g/t Au over 4 m located 600 m southeast of FMZ
ProjectsGolden Share Minerals Corporation
Property Status

The Forsan property consists in 50 contiguous claims for a total property surface area of 800 hectares. As of October 2007, Golden Share holds an option to acquire a 100% interest over 3 years by paying the Vendor a total of $125,000; issuing 1,200,000 shares and incurring a total of $500,000 in exploration expenditures. An additional 800,000 shares can be issued at any time in the event that measured and indicated resources representing a metal content of 500,000 ounces of gold or more can be defined; a first tranche of 400,000 shares would be issued when a first threshold of 250,000 ounces of gold is achieved.

Laurence Huss, P.Geo., Vice-president Exploration of Golden Share Mining Corporation and Qualified Person for Golden Share, has reviewed and approved the content of Forsan informations.


Email 'Property Status' to a friend
Show printable version of 'Property Status' in a New Window

--
:Show image 'Forsan Regional Geology' in New Window:
--
Forsan Regional Geology
166 KB, approx. 32 seconds at 56.6Kbps

--
:Show image 'Forsan Property Geology' in New Window:
--
Forsan Property Geology
136 KB, approx. 26 seconds at 56.6Kbps

--
:Show image 'FEZ 2009 Drilling results' in New Window:
--
FEZ 2009 Drilling results
121 KB, approx. 23 seconds at 56.6Kbps

--
:Show image 'Forsan Main zone' in New Window:
--
Forsan Main zone
377 KB, approx. 1 minute, 11 seconds at 56.6Kbps

--
:Show image 'Forsan SECTION 300m E' in New Window:
--
Forsan SECTION 300m E
138 KB, approx. 27 seconds at 56.6Kbps

--
:Show image 'Forsan 2008 Trenching results' in New Window:
--
Forsan 2008 Trenching results
230 KB, approx. 44 seconds at 56.6Kbps

--
:Show image 'Forsan Regional' in New Window:
--
Forsan Regional
189 KB, approx. 36 seconds at 56.6Kbps

--
:Show image 'Forsan Main zone 1' in New Window:
--
Forsan Main zone 1
112 KB, approx. 22 seconds at 56.6Kbps

--
:Show image 'Forsan Main zone 2' in New Window:
--
Forsan Main zone 2
91 KB, approx. 18 seconds at 56.6Kbps

--
:Show image 'Philippe Giaro and Pierre Poisson inspecting mafic agglomerate' in New Window:
--
Philippe Giaro and Pierre Poisson inspecting mafic agglomerate
173 KB, approx. 33 seconds at 56.6Kbps

--
:Show image 'Trench 1' in New Window:
--
Trench 1
90 KB, approx. 18 seconds at 56.6Kbps

--
:Show image 'Trench 4' in New Window:
--
Trench 4
149 KB, approx. 29 seconds at 56.6Kbps

--
:Show image 'Trench 5' in New Window:
--
Trench 5
153 KB, approx. 29 seconds at 56.6Kbps

--
:Show image 'Laurence Huss and Pierre Poisson inspecting channel sampling' in New Window:
--
Laurence Huss and Pierre Poisson inspecting channel sampling
170 KB, approx. 33 seconds at 56.6Kbps

--
:Show image 'Trench 8A' in New Window:
--
Trench 8A
145 KB, approx. 28 seconds at 56.6Kbps

--
:Show image 'Trench 8B' in New Window:
--
Trench 8B
127 KB, approx. 25 seconds at 56.6Kbps

--
:Show image 'Benoit Boudrault (Technicien) on 2009 Drilling' in New Window:
--
Benoit Boudrault (Technicien) on 2009 Drilling
73 KB, approx. 15 seconds at 56.6Kbps

--
:Show image 'Forsan drilling on March 2009' in New Window:
--
Forsan drilling on March 2009
197 KB, approx. 38 seconds at 56.6Kbps

--
:Show image 'FEZ zone : Hole GSH-09-24, blobs of sulfides in albitic level' in New Window:
--
FEZ zone : Hole GSH-09-24, blobs of sulfides in albitic level
455 KB, approx. 1 minute, 26 seconds at 56.6Kbps

--
:Show image 'FEZ zone : Hole GSH-09-18 56.86 g/t Au over 4.00 m from 42.00 to 46.00 m including 226.00 g/t over 1.00 m' in New Window:
--
FEZ zone : Hole GSH-09-18 56.86 g/t Au over 4.00 m from 42.00 to 46.00 m including 226.00 g/t over 1.00 m
406 KB, approx. 1 minute, 17 seconds at 56.6Kbps

View all maps & Photos

View Technical Report